Modification should include demonstration of knowledge of flow lines and continuous improvement by
- redesigning those processes
- eliminating bottlenecks and other problem areas
- readjusting the schedule
- reallocating workforce
- document changes.
Process/Skill Questions:
- How does downtime affect the manufacturing process?
- What is a go/no-go gauge?
- How does inspection affect the process?
- How are acceptable tolerances determined?