Digging a clean trench should be done according to all laws and regulations, including ensuring that
- the spoil pile is set at a minimum of 2 feet away from the trench
- the trench is no greater than 3 feet deep.
Process/Skill Questions:
- Where should one place the spoil pile?
- At what depth is shoring required?
- What can be done to reduce trench depth?