Preparation should include
- accessing dimensioned sketches and/or actual parts of a mechanical assembly
- preparing dimensioned orthographic drawings of each individual part
- assigning each part an identification number and tag (balloon)
- preparing an orthographic assembly drawing with parts list
- preparing an exploded assembly drawing with parts list.
Process/Skill Questions:
- Why are dimensional and annotation standards important for working drawings?
- How are sub-assembly drawings incorporated into a working drawing?